Sixei Ltd. Co. and Institute of Biotechnology & Environment – Nha Trang University cooperate to upgrade the centralized WWTP of Suoi Dau industrial park.
The existing WWTP of Suoi Dau was built in 2001 and has been degrading severely recently. Its current capacity reaches 2500 m3/day.
After being upgraded, the WWTP will be capable of treating 5000 m3/day. The effluent meets the National Technical Regulation on Industrial Wastewater QCVN 40:2011 / BTNMT, column A.